-
Ballast Excavation
Road/Rail Ballast Undercutter Trencher
RABUC480-RRC – Ballast Undercutter and Lineside Trenching Machine
Transforming track maintenance and refurbishment efficiencies:
Excavates challenging ground conditions – consolidated Ballast with fines can be very hard to excavate when the track is left in situ, but not for this machine.
• Mobilisation: Machine On tracks in 15 minutes and self digs under the track in 15 minutes.
• Excavation depth of 200mm – 500mm …
Ballast Excavation
Showing the single result